Viewing posts categorised under: Construction Management

Socha Plaza Mixed-Use Building

Socha Plaza Mixed-Use Building

twacm8

Construction Value: $13m
Location: Glenville, NY
Assignment: Construction Management
Completion: 2014
Client: Shady Lane Realty

TW&A acted as Construction Manager (Agent Owner) for this $13mm, 60,000 s.f., 3 story mixed use building in Glenville, NY. The first floor consists of Class A retail and office space along with space for a restaurant, the second floor contains office space, and the third floor has 16 apartments (6 corporate, 4 standard, and 6 high-end luxury). TW&A was involved throughout the project from the initial design phase until final completion in September 2014. TW&A coordinated the 17 prime contractors for the project and provided an on-site superintendent. In addition, TW&A acted as owner’s rep for the four major tenant fit ups concurrently. The project was completed on schedule and under budget.

Rock City Centre

Rock City Centre

IMG_8290-HDR

Construction Value: $7.2m
Location: Little Falls, NY
Assignment: Owner Representative/Construction Manager
Completion: 2021
Client: Rock City Centre, LLC

TW&A acted as owner’s representative to Rock City Centre, LLC with respect to its $7.2 million renovation of an existing one-story building into a two-story building with a rooftop deck. Rock City Centre will use the building as its corporate headquarters and provide a flex workspace for remote professional and non-profits. TW&A’s scope of work included pre-construction and design coordination, development of a master milestone schedule, development of a project budget, construction contract bidding, assistance with construction contracting, project cost control, document control, construction monitoring and project closeout. The project was completed on time (after considering delays due to COVID) and under budget.

Gateway Plaza

Gateway Plaza

MMW photo 2

Construction Value: $1.7m
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2017
Client: Schenectady Metroplex Development Authority

TW&A, on behalf of the Schenectady Metroplex Development Authority, acted as Construction Manager for Gateway Plaza, a $1.7mm park renovation in Schenectady, NY. TW&A was involved throughout the project from the initial design phase until final completion in November 2017.  Gateway Plaza was awarded the NY Upstate ASLA 2019 Merit Award for Built Design.

414 Broadway, Albany

414 Broadway, Albany

IMG_6261 (exterior2)

Construction Value: $1.1m
Location: Albany, NY
Assignment: Construction Management
Completion: 2018
Client: Broadway 414, LLC

TW&A acted as Construction Manager for this $1.3 million renovation of an existing four-story building into a restaurant, bar and apartments.  The Company was involved in all phases of the project from initial design to final completion in April 2018.  

Bishop Maginn High School

Bishop Maginn High School

Bishop-Maginn-1000x1000

Construction Value: $1.65m
Location: Albany, NY
Assignment: Construction Management
Completion: 2015
Client: Burke Community Service Corp. / Roman Catholic Diocese of Albany

TW&A acted as Construction Manager for this $1.65 million renovation of an existing elementary school into the new Bishop Maginn High School. TW&A was involved in all phases of the project from initial design to final completion. Generally, the duration for this type of project would be 6-8 months. This project was completed within 60 days.

Weigh Station

Weigh Station

Picture1

Construction Value: $234K
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2016
Client: Schenectady Metroplex Development Authority

TW&A represented Metroplex Development Authority as Construction Manager for the new Weigh Station roof and parapets in Schenectady, New York. On behalf of Metroplex Development Authority, TW&A reviewed the Project’s contract documents, budget, and schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns. The project consisted of removal of old roof and masonry, repairs, and replacing the roof with a historically accurate slate roof and parapets.

Schenectady County Library Plaza

Schenectady County Library Plaza

twacm1small

Construction Value: $370K
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2015
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager representing Metroplex on the Schenectady County Library Plaza project. TW&A worked very closely with Jersen Construction Group, the general contractor. The goal of this project was to revitalize the hardscape and landscaping in the immediate area around the Library.

Project scope included input on project development and design, contract negotiations, and project oversight. TW&A established and coordinated project logistics and construction activities, while providing the interface between Jersen Construction and the City of Schenectady.

TW&A facilitated comprehensive project coordination meetings in order to develop team oriented project environment. This unique and appealing hardscape design maximizes the use of outdoor space through the addition of a seat wall, raised tree beds, patio area with benches while showcasing an existing art sculpture.

Franklin/Liberty Lot Reconstruction & Center City Walk

Franklin/Liberty Lot Reconstruction & Center City Walk

Joe Walk 3

Construction Value: 455k
Location: Schenectady, NY
Assignment: Design Builder/Construction Management
Completion: 2014
Client: Schenectady Metroplex Development Authority

TW&A acted as Design Builder/Construction Manager for the Franklin/Liberty Lot Reconstruction & pedestrian walkway project. TW&A assembled and led a team of local architects, engineers and trade contractors to address Metroplex’s desire to enhance traffic flow and parking within the Franklin/Liberty parking lot. The design also incorporates the new Center City Walk from Liberty Street to Franklin Street. This unique and inspiring pathway with modern decorative lighting and ornamental fencing provides a welcoming and secure atmosphere while incorporating two iconic monument signs with updatable message boards.

Lower State Street Vault Improvements

Lower State Street Vault Improvements

twacm6f

Construction Value: 800k
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2014
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager representing Metroplex in coordination with the City of Schenectady on the Lower State Street Vault Stabilization project. TW&A worked closely with the general contractor Callanan Industries in the completion of this project. The project scope involved the removal and/or reconstruction of 54 vaults beneath the sidewalks on State Street between Erie Boulevard and South Church Street. This project was time sensitive due the coordinated revitalization of the Lower State Street hardscape including new sidewalks, granite curbs, decorative light poles and asphalt roadway.

TW&A’s scope included advising on project design and development, contract negotiations and project oversight while coordinating construction logistics and activities. TW&A also provided an interface between the contractor and the City of Schenectady, as well as property and business owners. TW&A facilitated comprehensive project coordination meetings while promoting team oriented interaction between all involved parties.

Malta Med Emergent Care

Tech Valley High School

full_saratoga_hospital

Construction Value: $15m
Location: Malta, NY
Assignment: Construction Monitor
Completion: 2013
Client: Liberty Bank

TW&A represented Liberty Bank’s interest as Mortgage Monitor for this 60,000 s.f. health care facility in Malta, New York. On behalf of the Bank, TW&A reviewed the Project contract documents, plans, budget, and construction schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns.

Foster Building

Foster Building

HiResTWA Foster Building011

Construction Value: $1m
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2012
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager for Schenectady Metroplex Authority in the stabilization of this historic Beaux Arts design property for further restoration. This intricate project required extensive repairs including the removal and replacement of top three floors structures while maintaining building structural integrity. The project also involved coordinated abatement of asbestos materials while performing shoring and construction activities. TW&A provided overall project management overseeing engineering, architectural and construction phases. TW&A coordinated and conducted comprehensive project meetings to ensure this successful stabilization on schedule and budget.

Bureau of Service LEEDS Facility

Bureau of Service LEEDS Facility

BOS Overhead

Construction Value: $23m
Location: Schenectady, NY
Assignment: Construction Manager
Completion: 2011
Client: City of Schenectady

TW&A acted as Construction Manager for this $23m, 137,000 s.f., 8 building, 4 phase LEEDS project that encompassed 2 city blocks. The Bureau of Services Facility houses the City’s entire Department of Public Works as well as offices for a number of City service Departments. Phase 1 & 2 included a 8,700 s.f. Salt Shed, a 26,000 s.f. LEEDS Maintenance /Office Building , a 60,000 s.f. Heated Vehicle storage facility as well as mitigation of 10,000 tons of unexpected contaminated soil. All phases were completed under budget and ahead of schedule.

Eight (8) Downtown Parking Lots

Eight (8) Downtown Parking Lots

full_parking2

Construction Value: $700k
Location: Schenectady, NY
Assignment: Construction Manager
Completion: 2006
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager for Metroplex during design, bidding and construction of all of the downtown Schenectady parking lots (8 total). The assignment included managing a community outreach program and close coordination with all Municipal Department heads relative to traffic, safety and expectation management. TW&A managed all onsite construction activities as well as represented the owner with all contractual, cost and schedule issues. The projects were completed under budget and ahead of schedule.

Park City

Park City

full_park_city

Construction Value: $3.5m
Location: Salt Lake City, Utah
Assignment: Project Manager
Completion: 2006
Client: O’Brien Kiernan Investment Co.
Architect: Richard Dresher

TW&A represented O’Brien Kiernan Investment Co. interest Kimball Junction shops in Salt lake City, Utah by acting as Project Manager managing all aspects of construction and design, including negotiating contracts, schedule & cost monitoring. This adaptive reuse project converted a large grocery store into five national retail stores, and included a large addition. The work was phased so that the current tenant was not disturbed. TW&A was able to ensure that the project was completed minimizing the owners exposure to construction issues throughout the entire project, while maintaining the project’s schedule & budget.

Proctors’ Block Redevelopment (Phase 1)

Proctors' Block Redevelopment (Phase 1)

full_proctors_redev

Construction Value: $85m
Location: Schenectady, New York
Assignment: Development Adviser/Program Manager
Completion: 2007
Client: Schenectady Metroplex Development Authority

TW&A acted as Program Manager assisting and advising Metroplex, as well as the City of Schenectady for the successful implementation of the “Proctor’s Block” Phase 1 Redevelopment Plan. This mixed use redevelopment area included: Proctors Theater, Bowtie Cinema, Parker Inn, Hampton Inn, Appertivo Restaurant/Offices & Apartments, Clinton South Parking Lot, a Central Co Gen Heating Plant and a snow melt system. Scope included project development advisement, design and negotiations assistance, monitoring SEQRA process, project and contract oversight, establishing and monitoring construction logistics, coordination of construction activities including interface between all involved parties, development and maintenance of overall program schedule, and community interface with adjacent property owners and business. TW&A also chaired comprehensive coordination meetings, inspired team oriented communication between all involved parties, developed and maintained overall program schedule as well as established and monitored construction activities and logistics to insure safe procedure. TW&A’s original contract was renewed on three separate occasions due to our successful project delivery methods.

Grey Ledge Estates

Grey Ledge Estates

full_grey_ledge

Construction Value: $850k
Location: Albany, New York
Assignment: Construction Manager
Completion: 2007
Client: Quantum Development

TW&A acted as Construction Manager for the 850k Grey Ledge Estates site work package. TW&A managed all design, budgeting, bidding and construction of the Earthwork, Site utilities, Roadwork, Landscaping & Building pad preperations to allow the construction of 44 high end townhomes by Amedore builders.

124 Jay Street

124 Jay Street

full_jay

Construction Value: $400k
Location: Schenectady, NY
Assignment: Construction Manager
Completion: 2008
Client: OBAN Associates, LLC
Architect: SRG

TW&A teamed up with AKW Associates to provide Construction Management Services to Oban Associates for the adaptive reuse renovation & façade construction of 124 Jay Street 1st floor. This adaptive reuse renovation of the first floor was an extremely aggressive tenant fit up schedule allowing a full gut/rehab to take place within five weeks. The façade work was phased in after the 1st floor tenant occupied and opened for business.

Bomber’s Burrito

Bomber's Burrito

Bombers

Construction Value: $66m
Location: Schenectady, NY
Assignment: Program Manager
Completion: 2010
Client: Schenectady Metroplex Development Authority

TW&A is acting as Financier Rep for this 8,000sf Mexican Restaurant, & then as Construction Manager for a complete facade restorations. TW&A also coordinated all actives between all interior restoration work and exterior Facades work that was occurring simultaneously.

111 Liberty Street

111 Liberty Street

111-Liberty-Street

Construction Value: $2m
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2015
Client: Schenectady Metroplex Development Authority

On behalf of Metroplex Development Authority, TW&A: reviewed the Project’s contract documents, budget, and schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns. The project consisted of renovations to the interior framing and MEP, and demolition of the infill building on site.

151 Lafayette Street

151 Lafayette Street

151 Lafayette

Construction Value: $2m
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2015
Client: Schenectady Metroplex Development Authority

On behalf of Metroplex Development Authority, TW&A: reviewed the Project’s contract documents, budget, and schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns. The project consisted of renovations to the interior framing and MEP, and demolition of the infill building on site.