Socha Plaza Mixed-Use Building

Socha Plaza Mixed-Use Building

twacm8

Construction Value: $13m
Location: Glenville, NY
Assignment: Construction Management
Completion: 2014
Client: Shady Lane Realty

TW&A acted as Construction Manager (Agent Owner) for this $13mm, 60,000 s.f., 3 story mixed use building in Glenville, NY. The first floor consists of Class A retail and office space along with space for a restaurant, the second floor contains office space, and the third floor has 16 apartments (6 corporate, 4 standard, and 6 high-end luxury). TW&A was involved throughout the project from the initial design phase until final completion in September 2014. TW&A coordinated the 17 prime contractors for the project and provided an on-site superintendent. In addition, TW&A acted as owner’s rep for the four major tenant fit ups concurrently. The project was completed on schedule and under budget.

Proctor’s Theater

Proctor's Theater

full_proctors

Construction Value: $22m
Location: Schenectady, NY
Assignment: Financer Representative
Completion: 2005
Client: Schenectady Metroplex Development Authority

The Proctor’s Theater is the historic “Crown Jewel” of downtown Schenectady. This wonderful, historic vaudeville theater consisting of 2,700 seats was expanded from 67,000 sq. ft. to 132,000 sq. ft. of operations space. Work included expansion and technical upgrade of the main stage house. In addition, the adjoining building, the former Carl Company, was renovated to contain the main stage support for Proctor’s Theater as well as a new 450 seat Black Box Theater with large format imaging, such as IMAX and IWERKS. TW&A represented the Schenectady Metroplex Authority’s interest in this project which included budget and schedule review.

Bishop Maginn High School

Bishop Maginn High School

Bishop-Maginn-1000x1000

Construction Value: $1.65m
Location: Albany, NY
Assignment: Construction Management
Completion: 2015
Client: Burke Community Service Corp. / Roman Catholic Diocese of Albany

TW&A acted as Construction Manager for this $1.65 million renovation of an existing elementary school into the new Bishop Maginn High School. TW&A was involved in all phases of the project from initial design to final completion. Generally, the duration for this type of project would be 6-8 months. This project was completed within 60 days.

Schenectady County Library Plaza

Schenectady County Library Plaza

twacm1small

Construction Value: $370K
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2015
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager representing Metroplex on the Schenectady County Library Plaza project. TW&A worked very closely with Jersen Construction Group, the general contractor. The goal of this project was to revitalize the hardscape and landscaping in the immediate area around the Library.

Project scope included input on project development and design, contract negotiations, and project oversight. TW&A established and coordinated project logistics and construction activities, while providing the interface between Jersen Construction and the City of Schenectady.

TW&A facilitated comprehensive project coordination meetings in order to develop team oriented project environment. This unique and appealing hardscape design maximizes the use of outdoor space through the addition of a seat wall, raised tree beds, patio area with benches while showcasing an existing art sculpture.

Tech Valley High School

Tech Valley High School

ModifiedIMG_0029

Construction Value: $8m
Location: Albany, NY
Assignment: Financier Representative
Completion: 2015
Client: Capital Bank

TW&A represented Capital Bank as Bank Representative for the Tech Valley High School in Albany, New York. On behalf of the Bank, TW&A: reviewed the Project’s contract documents, budget, and schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns.

Ellis Primary Care

Ellis Primary Care

twacm3f

Construction Value: 450k
Location: Glenville, NY
Assignment: Owner’s Representative
Completion: Socha Management, Inc.
Client: 2014

TW&A acted as Owner’s Representative for the construction of Ellis Hospital Primary Care at 115 Socha Plaza. The 5,464 sf space consists of a Primary Care Clinic and a Blood Draw Facility. As Owner’s Representative, TW&A oversaw the construction of the tenant fit out, while simultaneously constructing Socha Plaza. TW&A worked closely with the general contractor, BBL Construction Services to facilitate the completion of the work ahead of schedule.

Albany Medical Center’s EmUrgent Care

Albany Medical Center's EmUrgent Care

twacm4f

Construction Value: 430k
Location: Glenville, NY
Assignment: Owner’s Representative
Completion: 2014
Client: Socha Management, Inc.

TW&A acted as Owner’s Representative for the construction of Albany Medical Center’s EmUrgent Care at 115 Socha Plaza. The 4,130 s.f. space consists of 8 exams rooms and supplemental spaces. As Owner’s Rep, TW&A oversaw the construction of the tenant fit out, while simultaneously constructing Socha Plaza. TW&A worked closely with BCI, the General Contractors, to facilitate the completion of the work ahead of schedule.

Franklin/Liberty Lot Reconstruction & Center City Walk

Franklin/Liberty Lot Reconstruction & Center City Walk

Joe Walk 3

Construction Value: 455k
Location: Schenectady, NY
Assignment: Design Builder/Construction Management
Completion: 2014
Client: Schenectady Metroplex Development Authority

TW&A acted as Design Builder/Construction Manager for the Franklin/Liberty Lot Reconstruction & pedestrian walkway project. TW&A assembled and led a team of local architects, engineers and trade contractors to address Metroplex’s desire to enhance traffic flow and parking within the Franklin/Liberty parking lot. The design also incorporates the new Center City Walk from Liberty Street to Franklin Street. This unique and inspiring pathway with modern decorative lighting and ornamental fencing provides a welcoming and secure atmosphere while incorporating two iconic monument signs with updatable message boards.

Lower State Street Vault Improvements

Lower State Street Vault Improvements

twacm6f

Construction Value: 800k
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2014
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager representing Metroplex in coordination with the City of Schenectady on the Lower State Street Vault Stabilization project. TW&A worked closely with the general contractor Callanan Industries in the completion of this project. The project scope involved the removal and/or reconstruction of 54 vaults beneath the sidewalks on State Street between Erie Boulevard and South Church Street. This project was time sensitive due the coordinated revitalization of the Lower State Street hardscape including new sidewalks, granite curbs, decorative light poles and asphalt roadway.

TW&A’s scope included advising on project design and development, contract negotiations and project oversight while coordinating construction logistics and activities. TW&A also provided an interface between the contractor and the City of Schenectady, as well as property and business owners. TW&A facilitated comprehensive project coordination meetings while promoting team oriented interaction between all involved parties.

Mexican Radio

Mexican Radio

twacm7f

Construction Value: 2.39m
Location: Schenectady, NY
Assignment: Financier Representative
Completion: 2014
Client: NBT Bank

TW&A represented NBT Bank as Bank Representative for the construction of Mexican Radio in Schenectady, New York. On behalf of the Bank, TW&A: reviewed the Project’s contract documents, budget, and schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns.

Ballstonian

Ballstonian

twacm91f

Construction Value: 5.9m
Location: Ballston Spa, NY
Assignment: Financier Representative
Completion: 2014
Client: First Niagara Bank

TW&A represented First Niagara Bank’s interest as its Construction Monitor for this 71,000 sf multi-unit luxury apartment complex. On behalf of the Bank, TW&A reviewed the project contract documents, plans, budget, and construction schedule. TW&A also provided monthly onsite inspections and written field observation reports upon review of the work in place. In addition, TW&A reviewed payment applications for the project and identified potential budget and schedule overruns.

Admirals Walk Apartments

Admiral Walks Apartments

twacm92f

Construction Value: 1.5m
Location: Cohoes, NY
Assignment: Financier Representative
Completion: 2013
Client: First Niagara Bank

TW&A represented First Niagara Bank as the Construction Monitor for this multi-unit residential waterfront apartment complex. On behalf of the Bank, TW&A reviewed the Project’s contract documents, budget, and schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns.

440 State Street – Civco Realty Corp.

440 State Street

IMG_7459

Construction Value: 5m
Location: Schenectady, NY
Assignment: Financier Representative
Completion: 2013
Client: NBT Bank

TW&A represented NBT Bank’s interest as its Construction Monitor for this 25,000 s.f. commercial office building. On behalf of the Bank, TW&A reviewed construction contract documents, plans, budget, and construction schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns.

Falcon Trace Senior Living

Falcon Trace Senior Living

Falcon Trace Active Adult

Construction Value: $14.5m
Location: Halfmoon, NY
Assignment: Finanicer Representative
Completion: 2013
Client: First Niagara Bank

TW&A represented First Niagara Bank’s interest as its Mortgage Monitor on a senior living complex that included a core building and four residential wings totaling over 161,000 Sq/Ft. On behalf of the Bank, TW&A: reviewed the Project’s contract documents, budget, and schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns.

Malta Med Emergent Care

Tech Valley High School

full_saratoga_hospital

Construction Value: $15m
Location: Malta, NY
Assignment: Construction Monitor
Completion: 2013
Client: Liberty Bank

TW&A represented Liberty Bank’s interest as Mortgage Monitor for this 60,000 s.f. health care facility in Malta, New York. On behalf of the Bank, TW&A reviewed the Project contract documents, plans, budget, and construction schedule; provided monthly onsite inspections and written field observation reports confirming the quantity of work in place; recommended disbursements for the Project; and identified potential budget and schedule overruns.

Foster Building

Foster Building

HiResTWA Foster Building011

Construction Value: $1m
Location: Schenectady, NY
Assignment: Construction Management
Completion: 2012
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager for Schenectady Metroplex Authority in the stabilization of this historic Beaux Arts design property for further restoration. This intricate project required extensive repairs including the removal and replacement of top three floors structures while maintaining building structural integrity. The project also involved coordinated abatement of asbestos materials while performing shoring and construction activities. TW&A provided overall project management overseeing engineering, architectural and construction phases. TW&A coordinated and conducted comprehensive project meetings to ensure this successful stabilization on schedule and budget.

Bureau of Service LEEDS Facility

Bureau of Service LEEDS Facility

BOS Overhead

Construction Value: $23m
Location: Schenectady, NY
Assignment: Construction Manager
Completion: 2011
Client: City of Schenectady

TW&A acted as Construction Manager for this $23m, 137,000 s.f., 8 building, 4 phase LEEDS project that encompassed 2 city blocks. The Bureau of Services Facility houses the City’s entire Department of Public Works as well as offices for a number of City service Departments. Phase 1 & 2 included a 8,700 s.f. Salt Shed, a 26,000 s.f. LEEDS Maintenance /Office Building , a 60,000 s.f. Heated Vehicle storage facility as well as mitigation of 10,000 tons of unexpected contaminated soil. All phases were completed under budget and ahead of schedule.

Jay Walk Alley Arch Lighting

Jay Walk Alley Arch Lighting

full_jay_walk

Construction Value: $150k
Location: Schenectady, NY
Assignment: Design Build
Completion: 2010
Client: Schenectady Metroplex Development Authority

TW&A acted as Design Builder for the Jay Walk Alley Arch Lighting program. TW&A built and led a team of local designers and trade contractors to address Metroplex’s desire to provide distinctive and attractive lighting in two of Jay Walks dark alleys. In addition to providing a safe well lit atmosphere, way finding from and to the adjacent parking lots needed to be addressed, all while providing a design that local business owner were comfortable with. TW&A’s team came up with a completely custom Alley Arch Lighting system that exceeded all of these requirements according to Metroplex.

Center City Block Redevelopment (Phase 3)

Center City Block Redevelopment (Phase 3)

full_center_city_redev

TW&A acted as Program Manager assisting and advising Metroplex as well as the City of Schenectady for the successful implementation of the “Center City” Phase 3 downtown redevelopment plan.

Construction Value: $66m
Location: Schenectady, NY
Assignment: Program Manager
Completion: 2010
Client: Schenectady Metroplex Development Authority

TW&A acted as Program Manager assisting and advising Metroplex as well as the City of Schenectady for the successful implementation of the “Center City” Phase 3 downtown redevelopment plan. This mixed-use redevelopment is the entire 400 block of State Street including Center City, YMCA, Paul Mitchell Building and Center City parking. Scope included project development advisement, design and negotiations assistance, monitoring SEQRA process, project and contract oversight, establish and monitoring construction logistics, coordination of construction activities including interface between all involved parties, development and maintenance of overall program schedule, and community interface with adjacent property owners and business. TW&A also, chaired comprehensive coordination meetings, inspired team-oriented communication between all involved parties, developed and maintained overall program schedule as well as established and monitored construction activities and logistics to ensure safe procedure. TW&A’s original contract was also renewed for this work, which is currently enforced.

Eight (8) Downtown Parking Lots

Eight (8) Downtown Parking Lots

full_parking2

Construction Value: $700k
Location: Schenectady, NY
Assignment: Construction Manager
Completion: 2006
Client: Schenectady Metroplex Development Authority

TW&A acted as Construction Manager for Metroplex during design, bidding and construction of all of the downtown Schenectady parking lots (8 total). The assignment included managing a community outreach program and close coordination with all Municipal Department heads relative to traffic, safety and expectation management. TW&A managed all onsite construction activities as well as represented the owner with all contractual, cost and schedule issues. The projects were completed under budget and ahead of schedule.

Park City

Park City

full_park_city

Construction Value: $3.5m
Location: Salt Lake City, Utah
Assignment: Project Manager
Completion: 2006
Client: O’Brien Kiernan Investment Co.
Architect: Richard Dresher

TW&A represented O’Brien Kiernan Investment Co. interest Kimball Junction shops in Salt lake City, Utah by acting as Project Manager managing all aspects of construction and design, including negotiating contracts, schedule & cost monitoring. This adaptive reuse project converted a large grocery store into five national retail stores, and included a large addition. The work was phased so that the current tenant was not disturbed. TW&A was able to ensure that the project was completed minimizing the owners exposure to construction issues throughout the entire project, while maintaining the project’s schedule & budget.

Vet Hospital

Vet Hospital

full_vet_hospital

Construction Value: $900k
Location: Delmar, New York
Assignment: Bank Representative
Completion: 2006
Client: First Niagra Bank

TW&A represented First Niagara Bank’s interest by monitoring value and quality of work put in place, general job overview and schedule monitoring. TW&A provided onsite inspections coupled with written field observation reports confirming the value and quality of work in place prior to each pay application on this Vet Hospital project.

Proctors’ Block Redevelopment (Phase 1)

Proctors' Block Redevelopment (Phase 1)

full_proctors_redev

Construction Value: $85m
Location: Schenectady, New York
Assignment: Development Adviser/Program Manager
Completion: 2007
Client: Schenectady Metroplex Development Authority

TW&A acted as Program Manager assisting and advising Metroplex, as well as the City of Schenectady for the successful implementation of the “Proctor’s Block” Phase 1 Redevelopment Plan. This mixed use redevelopment area included: Proctors Theater, Bowtie Cinema, Parker Inn, Hampton Inn, Appertivo Restaurant/Offices & Apartments, Clinton South Parking Lot, a Central Co Gen Heating Plant and a snow melt system. Scope included project development advisement, design and negotiations assistance, monitoring SEQRA process, project and contract oversight, establishing and monitoring construction logistics, coordination of construction activities including interface between all involved parties, development and maintenance of overall program schedule, and community interface with adjacent property owners and business. TW&A also chaired comprehensive coordination meetings, inspired team oriented communication between all involved parties, developed and maintained overall program schedule as well as established and monitored construction activities and logistics to insure safe procedure. TW&A’s original contract was renewed on three separate occasions due to our successful project delivery methods.

Grey Ledge Estates

Grey Ledge Estates

full_grey_ledge

Construction Value: $850k
Location: Albany, New York
Assignment: Construction Manager
Completion: 2007
Client: Quantum Development

TW&A acted as Construction Manager for the 850k Grey Ledge Estates site work package. TW&A managed all design, budgeting, bidding and construction of the Earthwork, Site utilities, Roadwork, Landscaping & Building pad preperations to allow the construction of 44 high end townhomes by Amedore builders.

Wellington Gardens

Wellington Gardens

full_wellington

Construction Value: $4.5m
Location: Rotterdam, New York
Assignment: Bank Representative
Completion: 2007
Client: First Niagra Bank

TW&A represented First Niagara Bank’s interest by monitoring value and quality of work put in place, as well as general job overview and schedule monitoring. TW&A provided onsite inspections coupled with written field observation reports confirming the value and quality of work in place prior to each pay application on this Apartment Complex project.

Valley View Townhomes

Valley View Townhomes

full_valley_view

Construction Value: $760k
Location: Rensselaer, New York
Assignment: Bank Representative
Completion: 2007
Client: Berkshire Bank

TW&A represented Berkshire Bank’s interest by monitoring value and quality of work put in place, general job overview and schedule monitoring. TW&A provided onsite inspections coupled with written field observation reports confirming the value and quality of work in place prior to each pay application on this Townhome & Sitework project.

Shoppes of Halfmoon

Shoppes of Halfmoon

full_shoppes_halfmoon

Construction Value: $4.5m
Location: Clifton Park, New York
Assignment: Bank Representative
Completion: 2007
Client: First Niagra Bank

TW&A represented First Niagara Bank’s interest by monitoring value and quality of work put in place, as well as general job overview and schedule monitoring. TW&A provided onsite inspections coupled with written field observation reports confirming the value and quality of work in place prior to each pay application on this Strip Mall Retail Space project.

Pilates Principle

Pilates Principle

full_pilates

Construction Value: $2m
Location: Colonie, New York
Assignment: Owners Representative
Completion: 2007
Client: Jerry & Nuhar Jaleel

TW&A represented Jerry & Nuhar Jaleel’s interest by overseeing & advising on all aspects of construction and design including quality of work put in place, and schedule monitoring. This beautiful Pilates Training Facility project was an addition/renovation project phased so that the current tenants were not disturbed. TW&A was able to ensure that the project was completed while maintaining excellent teamwork though out the entire project, exceeding the owners expectations.

Mazzone Project

Mazzone Project

full_mazzone

Construction Value: $9.5m
Location: Schenectady, New York
Assignment: Financer Representative
Completion: 2007
Client: Schenectady Metroplex Development Authority

TW&A represented Schenectday Metroplex Authority’s interest by monitoring value and quality of work put in place, as well as general job overview and schedule monitoring. TW&A provided onsite inspections coupled with written field observation reports confirming the value and quality of work in place prior to each pay application on this heavy gut/rehab project.

Halfmoon Dental Hospital

Halfmoon Dental Hospital

full_halfmoon_dental

Construction Value: $800k
Location: Clifton Park, New York
Assignment: Bank Representative
Completion: 2007
Client: First Niagara Bank

TW&A represented First Niagara Bank’s interest by monitoring value and quality of work put in place, as well as general job overview and schedule monitoring. TW&A provided onsite inspections coupled with written field observation reports confirming the value and quality of work in place prior to each pay application on this Dental Office Building project.